300m³/day Milk Factory Wastewater Treatment Project Case

1. Case Basic Information

300m³day Milk Factory Wastewater Treatment

1.1 Project Subject

  • Provider: HELLA WATER, a professional supplier of high-performance water treatment product, specializes in customized organic wastewater treatment solutions for the food and dairy industry.
  • Core Product: 300m³/day Integrated Milk Factory Wastewater Treatment System (combines air flotation, anaerobic, A2O biochemical, sedimentation, and disinfection processes)
  • Project Objective: Treat high-concentration organic wastewater from milk production to meet discharge standards, achieving efficient removal of COD, BOD, SS, and grease.

1.2 Treatment Scale & Water Quality Parameters

Treatment Scale

  • Daily Treatment Capacity: 300 m³
  • Hourly Treatment Capacity: 40 m³/h (peak flow)

Inlet & Outlet Water Quality

ParameterInlet ConcentrationOutlet Concentration
COD (Chemical Oxygen Demand)≤6000 mg/L≤125 mg/L
BOD₅ (Biochemical Oxygen Demand)≤3000 mg/L≤25 mg/L
pH6.0~9.06.0~9.0
SS (Suspended Solids)≤600 mg/L≤50 mg/L
Grease≤500 mg/L (estimated, milk factory typical value)≤10 mg/L (estimated)

1.3 Core Equipment Specifications

Equipment ModuleSpecificationsQuantity
Dissolved Air Flotation Machine40 m³/h; Size: 6.0×2.8×3.2m; Carbon steel anti-corrosion; Includes PAC/PAM dosing devices1 set
Anaerobic Tower300 m³/day; Size: φ3.5×10.0m; Internal/external anti-rust paint; Three-phase separator2 units
Integrated A2O Equipment300 m³/day; Size: 15.0×3.0×3.0m; Includes anaerobic/anoxic/aerobic/sedimentation/disinfection tanks6 sets
Stacked Screw Filter PressSludge dewatering; Moisture content: 75-85%1 set
Aeration FanModel SR100-5.5; Air volume: 6 m³/min; Power: 5.5kW; 2 for use, 1 for backup3 units
Dosing EquipmentPAC/PAM disinfection dosing devices; PE barrels + metering pumps4 sets
Control SystemPLC touch screen control cabinet; Manual/automatic integration1 set

1.4 Design Standards & Compliance

The system adheres to core national and industrial standards, including:

  • GB 8978-1996: Integrated Wastewater Discharge Standard
  • GB 50014-2006: Code for Design of Outdoor Drainage
  • JB2932-1999: Technical Specifications for Water Treatment Equipment
  • Food Industry Wastewater Treatment Technical Specifications
  • ISO 9001: Quality Management System Certification

1.5 Application Scenarios

  • Medium-sized milk processing factories (raw milk cleaning, product processing wastewater)
  • Dairy product manufacturing wastewater treatment (yogurt, cheese production)
  • High-concentration organic wastewater treatment in the food processing industry
  • Regions with strict environmental discharge requirements for organic pollutants

2. Project Core Pain Points & Requirements

300 m³day Milk Factory Wastewater Treatment Plant Project

2.1 Industry Common Pain Points

  1. High Organic Load: Milk factory wastewater has extremely high COD (≤6000 mg/L) and BOD (≤3000 mg/L), posing a heavy burden on biological treatment.
  2. Grease Contamination: Contains a large amount of milk fat and proteins, which easily cause equipment clogging and sludge floating.
  3. Fluctuating Water Quality: Batch production leads to significant fluctuations in wastewater flow and pollutant concentration, affecting treatment stability.
  4. Sludge Production: High organic content results in large sludge yields, requiring proper disposal to avoid secondary pollution.
  5. Strict Discharge Standards: Environmental regulations impose strict limits on organic pollutants, demanding efficient and stable treatment effects.

2.2 Customer Core Requirements

  • Efficient Purification: Achieve COD removal rate ≥98%, BOD removal rate ≥99%, and SS removal rate ≥92% to meet discharge standards.
  • Grease Removal: Effectively remove milk fat (removal rate ≥98%) to prevent equipment clogging and sludge deterioration.
  • Stable Operation: Adapt to water quality/quantity fluctuations and maintain consistent effluent quality.
  • Sludge Minimization: Reduce sludge production and simplify disposal (e.g., reuse as agricultural fertilizer).
  • Easy Operation: Realize semi-automatic/fully automatic control to reduce manual intervention.

3. Hella Water Customized Solutions

Dairy Milk Factory Wastewater Treatment Engineering Project Case

3.1 Process Design: Multi-Stage Organic Wastewater Treatment

The solution adopts a “Grille Regulation → Dissolved Air Flotation → Anaerobic Tower → A2O Biochemical → Sedimentation → Disinfection” integrated process, tailored for milk factory wastewater:

  1. Pretreatment Stage:
    • Grille Regulation Tank (civil engineering): Adjusts water quantity and quality; perforated aeration prevents SS sedimentation.
    • Dissolved Air Flotation Machine: Cooperates with chemical dosing system (PAC/PAM) to remove 98% of grease and 90% of SS. Micro-bubbles adsorb suspended solids and grease, forming scum scraped by the chain scraper, reducing subsequent biochemical load.
  2. Anaerobic Treatment Stage:
    • Anaerobic Tower: Filled with high-efficiency anaerobic fillers; under anaerobic conditions, anaerobic microorganisms decompose 60-70% of COD into biogas (methane) and water. Three-phase separators ensure gas-liquid-solid separation, improving treatment efficiency.
  3. Biochemical Treatment Stage (A2O Process):
    • Anoxic Tank: Facultative microorganisms convert organic nitrogen to ammonia nitrogen; use organic carbon sources to reduce NO₂⁻-N/NO₃⁻-N to N₂, achieving denitrification. DO ≤0.5 mg/L.
    • Aerobic Tank: Autotrophic nitrifying bacteria convert ammonia nitrogen to nitrate; combined fillers provide attachment sites for microorganisms. DO ≥3 mg/L, gas-water ratio 15:1. Nitrate reflux pump realizes internal circulation for denitrification.
  4. Deep Treatment & Disinfection Stage:
    • Sedimentation Tank: Cone-bottom design facilitates sludge precipitation; sludge return pump sends part of the sludge back to the anoxic tank to maintain microbial concentration.
    • Disinfection Tank: Chlorine-based disinfection equipment inactivates pathogenic microorganisms, ensuring effluent compliance.
  5. Sludge Treatment Stage:
    • Sludge from sedimentation tanks is concentrated in the sludge tank; stacked screw filter press dewaters sludge to 75-85% moisture content. The sludge, rich in organic matter, is reused as agricultural fertilizer.

3.2 Core Technical Advantages

Technical HighlightDescription
Targeted Grease RemovalDissolved air flotation machine efficiently removes milk fat, preventing clogging of subsequent anaerobic and aerobic systems.
High-Efficiency Anaerobic-Aerobic SynergyAnaerobic tower reduces high COD load; A2O process realizes simultaneous nitrogen and phosphorus removal, ensuring effluent compliance.
Robust Equipment DesignCarbon steel double-sided full welding (kerosene leak detection); galvanized steel filler brackets (diameter 10mm) for durability; reinforcement ribs enhance equipment strength.
Intelligent ControlPLC touch screen control cabinet supports manual/automatic switching; remote monitoring of key parameters (flow, DO, liquid level) reduces labor.
Sludge Resource UtilizationSludge is reused as organic fertilizer, reducing disposal costs and environmental impact.

3.3 Key Supporting Systems

  • Pre treatment filtration system: Grille + air flotation ensures inlet water quality for subsequent biochemical treatment.
  • Aeration System: Three Roots blowers (2 for use, 1 for backup) guarantee stable oxygen supply for aerobic reactions.
  • Dosing System: Automatic PAC/PAM/disinfectant dosing adjusts dosage based on water quality, optimizing treatment effect.

4. Project Effectiveness Verification

4.1 Pollutant Removal Efficiency

PollutantInlet ConcentrationOutlet ConcentrationRemoval Rate
COD≤6000 mg/L≤125 mg/L≥98.1%
BOD₅≤3000 mg/L≤25 mg/L≥99.2%
SS≤600 mg/L≤50 mg/L≥91.7%
Grease≤500 mg/L≤10 mg/L≥98.0%
Ammonia Nitrogen≤300 mg/L (estimated)≤15 mg/L (estimated)≥95.0%

4.2 Operational Performance

  • Stability: Continuous operation for 8000 hours with stable effluent quality; adapts to ±25% flow fluctuations and ±30% COD concentration changes.
  • Energy Efficiency: Total power consumption ≤1.2 kW·h/m³, lower than similar wastewater treatment systems (1.5-2.0 kW·h/m³).
  • Sludge Reduction: Annual sludge production ≤15 tons (dewatered), 40% less than traditional processes; reused as agricultural fertilizer.
  • Maintenance Cycle: Routine maintenance once a month (clean air flotation scum, check aeration equipment); anaerobic tower inspection every 6 months.

4.3 Economic & Environmental Benefits

  • Economic Benefits: Annual sewage discharge fee savings ≈USD 18,000; sludge disposal cost reduction ≈USD 5,000; equipment service life ≥10 years.
  • Environmental Benefits: Annual reduction of COD emission by ≈2,117 tons; BOD emission by ≈1,071 tons; reduces water pollution and protects local water ecosystems.

5. Case Corresponding Product Quotation Description

5.1 Total Quotation Overview

ItemDescriptionTotal Amount (USD)
Core Equipment40m³/h Dissolved Air Flotation Machine12,370
300m³/day Anaerobic Tower (2 units)58,800
300m³/day Integrated A2O Equipment125,000
Stacked Screw Filter Press4,000
External Mounting MaterialsPipes, flanges, valves, etc.25,000
Total Project Quotation–225,170

5.2 Key Equipment Quotation Details

Dissolved Air Flotation Machine (40m³/h)

NONameSpecificationQuantityRemark
1Main Body6.0×2.8×3.2m, carbon steel anti-corrosion1 setDouble-sided full welding, kerosene leak detection
2Dissolved Air TankZTRQ-401 setCarbon steel
3Reflux PumpZTQS-40, 7.5kW1 unitHELLA WATER
4Air CompressorZTKY-40, 2.2kW1 unitHELLA WATER
5PAC/PAM Dosing Devices2000L PE barrel + 1.1kW stirrer + 120L/h metering pump1 set eachHELLA WATER
6Control CabinetManual/automatic integration1 unitCarbon steel spray

Anaerobic Tower (300m³/day)

NONameSpecificationQuantityRemark
1Equipment Bodyφ3.5×10.0m, internal/external anti-rust paint2 unitsDouble-sided full welding
2Three-phase SeparatorMultilayer gas-liquid-solid separation2 setsHELLA WATER
3Inlet Lift PumpWQ43-13-3, 3kW2 unitsHELLA WATER pump
4Control SystemManual/automatic integration1 unitCarbon steel spray

5.3 Quotation Terms

Term TypeDetails
Validity Period20 working days from the date of quotation
Payment TermsT/T: 30% prepayment for production, 70% payment before shipping
Production Cycle30-40 days
Warranty Period2 years from the date of delivery (free repair/replacement for non-human damage)
Installation & MaintenanceFree online guidance (manual, video); on-site installation available at extra cost

6. Frequently Asked Questions (FAQ)

6.1 Installation & Commissioning

Q: What are the on-site installation requirements for the system?

A: The system requires an indoor/outdoor installation area of ≥200 m² with load-bearing ≥3 tons/m². It needs access to 380V AC power supply (total installed capacity ≈50kW) and stable wastewater inlet/drainage pipelines. We provide detailed installation drawings and dispatch technicians for online guidance; commissioning takes 5-7 days to complete system stabilization.

6.2 Maintenance & Upkeep

Q: How often does the core equipment require maintenance, and what are the key tasks?

A: Routine maintenance includes: 1) Daily: Clean air flotation scum and check dosing tank levels; 2) Weekly: Inspect aeration fans and pump operation; 3) Monthly: Clean air flotation releasers and calibrate dosing metering pumps; 4) Quarterly: Inspect anaerobic tower three-phase separators; 5) Annually: Replace filter elements and conduct sludge dewatering.

Q: How to handle grease clogging in the air flotation machine?

A: The air flotation machine is equipped with a high-pressure cleaning function; clean the flotation tank and releasers with high-pressure water every month. For severe clogging, add a small amount of degreasing agent to the dosing system to enhance grease removal.

6.3 Warranty & After-Sales

Q: What is covered under the 2-year warranty period?

A: Within the warranty period, we provide free repair or replacement for faults caused by design, manufacturing, or material defects, including core equipment (air flotation machine, anaerobic tower, integrated A2O equipment), pumps, fans, and control systems. Damage from improper operation, grease clogging due to poor maintenance, or natural disasters is not covered.

Q: How to access after-sales technical support?

A: We offer 24/7 online support via email and phone. For complex on-site issues, technicians can be dispatched within 48 hours (additional fees apply for non-warranty services). We also conduct semi-annual return visits to monitor system performance.

6.4 Operational Cost

Q: What is the estimated monthly operating cost of the system?

A: For a 300m³/day system, monthly operating costs include: 1) Electricity: ≈USD 1,080 (1.2 kW·h/m³ × 300 m³/d × 30 d × 0.1 USD/kW·h); 2) Chemicals (PAC/PAM/disinfectant): ≈USD 1,500; 3) Labor: ≈USD 800; 4) Sludge disposal (if not reused): ≈USD 0 (reused as fertilizer). Total monthly cost: ≈USD 3,380.

6.5 Safety & Compliance

Q: Is the treated effluent compliant with environmental regulations for food industry wastewater?

A: Yes. The effluent meets GB 8978-1996 Integrated Wastewater Discharge Standard and local food industry environmental requirements. We provide third-party testing reports to verify COD, BOD, SS, and grease concentrations, ensuring regulatory compliance.

Q: How to handle system failures to avoid untreated wastewater discharge?

A: The system is equipped with an emergency overflow pipeline and regulation tank (capable of storing 4-6 hours of wastewater). In case of equipment failure, the PLC control system triggers alarms and automatically switches to backup equipment (e.g., standby aeration fan), minimizing environmental impact.

Would you like me to prepare a detailed operation and maintenance manual that includes step-by-step cleaning procedures for the air flotation machine, anaerobic tower inspection checklists, and chemical dosage adjustment guides?

Do you need services?

We have the most comprehensive and professional solutions.

Table of Contents

Share to

Latest Case
Scroll to Top
PURE WATER. BETTER BUSINESS.

Advanced water treatment solutionsbuilt for performance, reliabilityand sustainability.

High Efficiency RO Systems
Reliable Performance
Sustainable Solutions
Trusted by Industries Worldwide
Engineered for Quality & Durability
Expert Support From Start to Success
Get a Free Water Treatment Quote

Share your requirements and our experts will provide a tailored solution for your business.

PURE WATER. BETTER BUSINESS.

Advanced water treatment solutionsbuilt for performance, reliabilityand sustainability.

High Efficiency RO Systems
Reliable Performance
Sustainable Solutions
Trusted by Industries Worldwide
Engineered for Quality & Durability
Expert Support From Start to Success
Get a Free Water Treatment Quote

Share your requirements and our experts will provide a tailored solution for your business.